1. Step 1 Drill
  2. Step 1 Drill

Drill

Patch

Pump

Initial material injections will fill any underslab void space. Once the void space is filled, subsequent injections will start lifting the concrete within minutes.

After the slabs are lifted, the access
holes are patched and the work is complete.

The slabjacking process generally starts with drilling small diameter
access holes in the concrete, strategically located to maximize lift.


Concrete Lifting
We Raise & Level Concrete
For MUCH Less than Replacement!
Residential & Commercial
FREE Estimates
Call Today: 506-470-2476